
Installation time of the Clo-Vent ventilation system by a D.H.Z.-er is max. 30 minutes
Restoration of toilets in 1 day: Sanitary work, possibly including wall panel and / or floor from Ocan Interiors, only covering the installed installation tank with Ocean Interior Panel (instead of wall tiles) is also possible.
Look for inspiration also: www.Ocean Interiors.nl.
A complete installation manual can be found here.
The technical data can be found here.
{module Willekeurige afbeelding}